![Greenfield H021 in the Marburg Pharma & Life Science Park](/fileadmin/_processed_/9/7/csm_Marburg_Freifl%C3%A4che_H021-1_45a1b7d732.jpg)

Brownfield / Marburg / Immediately

# Area H021

[Request property](mailto:bma@innexis.com)

Marburg

Marburg Pharma & Life Science Park, Main Plant site

4,500 m²

Available space

Immediately

Availability

## Usage and technical data

Heating type

Heat pump

Main energy source

Geothermal energy

Energy certificate available

Available

## Your advantages

- Site context:

The site benefits from immediate access to existing infrastructure, utilities, and integrated on-site services, enabling accelerated project timelines and reduced development complexity.
- Infrastructure:

Full access to GxP-compliant infrastructure and utilities, as well as direct access to existing utility providers and on-site services (plant fire department, occupational health, data center, cafeterias, parking, EV charging stations, etc.)
- Development Status:

Highly developed industrial site available for customized build-to-suite development within the existing GMP environment
- Potential Applications:

Designed for flexible use, it supports customized solutions for R&D, pilot production facilities, or GMP production facilities, including potential support space concepts for storage, utilities, and media supply
- Ideal for companies that want to get started quickly
- Potentially faster repurposing or development
- Connections to existing infrastructure
- Existing, well-serviced site surroundings
- Faster development thanks to existing site infrastructure (well-serviced, ready-to-build)
- Existing land / existing buildings with development potential

## Available solutions for your site

[Our parks: space for growth, production & research The INNEXIS Pharma & Life Science Parks combine modern, sustainable infrastructure with an environment that promotes exchange and cooperation. arrow_forward](/parks/)

[About us Who we are, what sets us apart, what makes us successful: Find out everything you need to know about the INNEXIS Group here. arrow_forward](/innexis/about-us/)

[Solutions From engineering to logistics: we provide you with tailor-made solutions for all aspects of production, storage and transportation - reliable, efficient and GxP-compliant. arrow_forward](/solutions/)

[Available solutions for your site](/solutions/)

arrow_back arrow_forward

![Portrait of Alexandra Hofmockel](/fileadmin/_processed_/4/5/csm_Frau_Dr_Alexandra_Hofmockel_208788e3d0.jpg)

## How can we support you?

For more information about rental conditions, room layouts and the integrated INNEXIS solutions, please get in touch with us.

Schedule a consultation

## Detailed location

Excellent transport links north of Frankfurt am Main, motorway access via the B3 and A5, very good links to local public transport and parking spaces available

![Bird's eye view of the Innexis site.](/fileadmin/user_upload/01_parks/01_marburg/Innexis-Pharmapark-Marburg.jpg)

Emil-von-Behring-Straße 76,

Area H021

35041 Marburg

Telefon: [+4964213914](tel:+4964213914)

E-Mail: info-marburginnexis.com info-marburginnexis.com

[Show route](https://maps.app.goo.gl/ggNVkxMqa8wboNK98)

## Further development areas

Filter:

Marburg
- All locations
- Marburg
- Orth

No development areas match the selected location.

Laboratory Facility
[![Building 04](/fileadmin/_processed_/e/8/csm_OR04_Tecan_ccc51cc986.jpg) Orth Immediately Existing building ### Building 04 Fully equipped laboratories made for process & analytical development with high-throughput systems.](/development-areas/building-04/)

[![Building 17](/fileadmin/_processed_/0/1/csm_OR17_Upstream_2__dcc505bf2d.jpg) Orth Immediately Existing building ### Building 17 Fully equipped laboratories suitable for process development or as pilot lab.](/development-areas/building-17/)

[![Building 24 - GMP](/fileadmin/_processed_/b/8/csm_OR24_BDS_0274bd7c62.jpg) Orth Immediately Existing building ### Building 24 - GMP Made for biologics: Clinical & commercial manufacturing, rec. proteins/ mAbs suspension cells.](/development-areas/building-24-gmp/)

[![Building 26 (North Part)](/fileadmin/_processed_/a/1/csm_OR26_PD_In_Process_Analytic_5d52d42a00.jpg) Orth Immediately Existing building ### Building 26 (North Part) Fully equipped laboratories, suitable for process & analytical development with high-throughput systems or as pilot lab.](/development-areas/building-26-north-part/)

[![Building 26 - GMP (South Part)](/fileadmin/_processed_/f/a/csm_OR26_GMP-Autoklav_a973cdac14.jpg) Orth Immediately Existing building ### Building 26 - GMP (South Part) Made for plasmid DNA / biologics: Clinical & commercial Mfg plasmid DNA/ mRNA/ Rec. proteins/ mAbs.](/development-areas/building-26-gmp-south-part/)

[![Building 07 - GMP](/fileadmin/_processed_/3/9/csm_OR07_Upstream_a4c023fecb.jpg) Orth Immediately Existing building ### Building 07 - GMP Made for Biologics / ATMP: Clinical & Commercial Mfg AAV/ mAbs suspension cells.](/development-areas/building-07-gmp/)

[![Building 89 - GMP](/fileadmin/_processed_/e/d/csm_OR89_Aussenaufnahme_45b1c3d65c.jpg) Orth Immediately Existing building ### Building 89 - GMP Made for ATMP: Clinical & commercial Mfg viral vectors / cell therapies.](/development-areas/building-89-gmp/)

Office / commercial building
[![Building M554, 2nd floor & 3rd floor (left wing)](/fileadmin/_processed_/f/4/csm_Park_Marburg_M554-01_cb3c5ddc8a.jpg) 1,095m² Marburg Immediately Existing building ### Building M554, 2nd floor & 3rd floor (left wing)](/development-areas/building-m554-2nd-floor-3rd-floor-left-wing/)

[![Building M555, 1st floor](/fileadmin/_processed_/3/0/csm_Park_Marburg_M555-05_05e28034de.jpg) 506m² Marburg Immediately Existing building ### Building M555, 1st floor](/development-areas/building-m555-1st-floor/)

[![Building M311, 4th floor](/fileadmin/_processed_/d/e/csm_Park_Marburg_M311-4_57f3dc8449.jpg) 130m² Marburg Immediately Existing building ### Building M311, 4th floor](/development-areas/building-m331-4th-floor/)

[![Building H034, 1st–3rd floors](/fileadmin/_processed_/c/f/csm_Marburg_H034-2_c002bca5e5.jpeg) 740m² Marburg Immediately Existing building ### Building H034, 1st–3rd floors](/development-areas/building-h034-1st-3rd-floor/)

[![Building M202, 1st floor & 2nd floor (left wing)](/fileadmin/_processed_/f/8/csm_Park_Marburg_M202-01_b70a38392f.jpg) 630m² Marburg Immediately Existing building ### Building M202, 1st floor & 2nd floor (left wing)](/development-areas/building-m202-1st-floor-2nd-floor-left-wing/)

[![Building H006, 4th floor](/fileadmin/_processed_/6/a/csm_Park_Marburg_H006-12_d48d01b6e3.jpg) 860m² Marburg Immediately Existing building ### Building H006, 4th floor](/development-areas/building-h006-4th-floor/)

Developable land
[![Görzhausen II site](/fileadmin/_processed_/b/8/csm_Marburg_Goerzhausen_2_Luftbild_0f4fd2274f.jpg) 56,000m² Marburg Immediately Greenfield ### Görzhausen II site](/development-areas/goerzhausen-2-site/)

[![Area H021](/fileadmin/_processed_/9/7/csm_Marburg_Freifl%C3%A4che_H021-1_66d2014395.jpg) 4,500m² Marburg Immediately Brownfield ### Area H021](/development-areas/area-h021/)
